Floor repair

Posted by Michael, July 8th , 2007.

Slippers on new floor
This floor was in sad shape.
It’s an earthship floor that seemed to be placed on the earth itself. Some of the earth / and adobe floor was really fluffy so we removed and patched the those spots with some pea gravel and new cob. Then we created a pretty straight forward mix of 2 : 1 sand to clay with chopped straw plus 1 cup of El Rey 200.

Continue…

Filed under: Projects

Gina’s Hogan

Posted by Michael, May 11th , 2007.

Recently we gave Gina’s cob hogan a new layer of plaster. We started off by poking at the existing earthen plaster; raking off the loose stuff. It was worn out, but what do you expect after 15 years? All around the base of the walls the earthen plaster had touched the ground. Moisture worked it’s way in. We had to remove about 3 inches in and 1 to 2 feet up in some spots. The wall underneath was still in good shape. We filled in with a stiffer cob mix, rich with sand. We under cut the new cob, rather than plopping it on the ground again. Continue…

Filed under: Projects

Adobe Healing

Posted by Michael, May 2nd , 2007.


This adobe wall suffered a water leak. I inspected the adobe bricks beneath and filled with an earthen plaster. Local materials were sourced for the plaster. Some of the mud came from a near by ditch and some came from the wall itself.
In the end the 10 foot walls received a lot of mud!

Kelly, the owner, sculpted a very nice relief on the finish plaster.

More photos ยป

Filed under: Projects

Mud fill on can wall

Posted by Michael, March 30th , 2007.

We’ve been focusing on the upstairs of the earthship, code named Raven’s Loop. We went searching for local earth resources for brown coat plaster. Most of the available earth material is aggregate and large rock. We did find a spot that had small amounts of clay and was just sticky enough to fill some of the gaps in the can walls. The earth is so much warmer feeling than the concrete.

Continue…

Filed under: Projects